Equipment intruduction

A.  Features of power quality control  system

1.  Improve power factor, reduce the waste of electricity.
2. Absorb   surge/harmonic ,and turn into effective power.
3. Stabilize the voltage and current,enhance the power gain.
4. Suppressing the fundamental frequency of each super harmonic pollution, interference.
5. Protect electrical equipment with anti-harmonic functions.

B.AMI  Smart grid management systems

1. High-low voltage side of the circuit monitor and record data
2. The multi-function meter display (IE instant interface both actual site meter)
3. Compare  data of  Taipower with P.Q.C.S. 
4. Instant trend in websites( Instant & history)
5. Monitor& Inquire remote

公司採用德國Janitza Electronic GmBh 開發智慧型電錶
符合國際電氣和電子協會IEEE標準認證
德國公司創立於1961年 專業製造多功能電錶 主力產品是電能管理裝置與提供客戶降低成本為目的 確保高品質的多功能電錶
 

C. Install schematic drawing of P.Q.C.S.

Product Warranty

1.Warranty

     The product from the date of acceptance by the SUN-U companies have warranty for 5 yearsWarranty scope of the system include saving equipmentPower off equipmentReach such as monitoring and power management system (AMI) performance and energy-saving rateDuring the warrantySUN-U have regular testing of the system is responsible for equipment and maintenanceAll costs shall be borne by the company SUN-U.
     WARRANTY lines listed above under the normal operating conditions is validIf the operator is not operating in accordance with the procedure provided by the Company,Power plant load exceeds the amount of the original design plan or because of irresistible natural disasters or accidents,The result when equipment is damaged or less than saving rate guarantee,Not within the scope of warranty.

2.Warranty liability

    This product warranty from the date of acceptance by the company in 10 years(It includes five-year warranty)Warranty period 6 to 10 yearsOwners highest burden of maintenance materials costs amount to one tenth of the total cumulative contract amount of the upper limitExcess borne by SUN-UUpon signingAnother contract signed warranty repair.
    Listed above warranty liability system under the normal operating conditions is validIf the operator is not operating in accordance with the procedure provided by the Company,Power plant load exceeds the amount of the original design plan or because of irresistible natural disasters or accidentsThe result when equipment is damaged or less than saving rate guaranteeNot within the scope of warranty.

3.Insurance Products

.Liability

二.Engineering Insurance(Template)

The Electricity Act
The Electricity Act in line with the provisions of the Republic of China
Chapter VIII   Penal Provisions

Article 105
  Offenders of theft or sabotage of electric poles, electric wires, transformers, or other power supply equipment shall be subject to aggravated punishment according to the Criminal Code.

Article 106
  Any person committing the following acts shall be deemed guilty of theft of electricity and shall be punished with imprisonment for not more than five (5) years, detention, or a fine of not more than one thousand and five hundred New Taiwan dollars (NT$1,500):
1. Unauthorized connection of electricity wires to the power supply lines of an electricity enterprise.
2. Circumvention of wires around the electric meter or other electricity measuring instruments, or damage or change the electric wiring outside the meter.
3. Damage or alteration of the structure of electric meters, power failure meters, or other electricity measuring instruments, or use of other measures to invalidate said instruments.
4. Unauthorized connection of electricity appliances of a higher-rate to electricity lines of a lower electricity rate.
5. Unauthorized addition to the originally set number of pieces or watts of lighting devices by lighting device exclusive users.
Electric power users adding horsepower, kilowatts, or kilo amps more than quoted in the original application without filing an application shall be held liable for the claim of electricity fee in accordance with Article 73.